AO-51 Having a difficult time

AMSAT Vice-President of Operations Drew Glasbrenner, KO4MA reported
the AO-51 Command Team is having a difficult time trying to restore
AO-51 to operation.

Amsat-echo51

The current situation is the satellite will not retain the upload of
the flight software across eclipse. The batteries are in very poor
condition.

ARISSat-1 Reception Challenge

ARISSat-1 is scheduled for deployment from the ISS next Wednesday Feb 16 – it has a composite VHF downlink that will easily fit into the FUNcube Dongle receive spectrum. The telemetry is 1 kbit BPSK and can, of course, also be received with a normal SSB 2 metre receiver.

The expected signal levels from ARISSat should be similar to those we expect from FUNcube itself (and also eventually  from UKube) and the team are keen to discover what will be the minimum and best type of antennas for schools to use with a FCD. Therefore user experience with the ARISSat signals will be very valuable in making this determination.

Continue reading →